GARS — Airport Way / Steese / Gaffney / Richardson Interchange

Fairbanks, AK · 2022–2024

HighwayDOT
Client
Alaska DOT&PF
Scope
Intersection reconstruction, bridge deck replacement, fiber optic signal interconnect
Timeline
2022 – 2024
Environment
High-traffic urban interchange and river bridge, Fairbanks

The Challenge

Reconstructing the intersection of Airport Way, Steese Expressway, Gaffney Road, and the Richardson Highway — one of Fairbanks’ busiest interchanges — while also replacing the deck of the Chena River Bridge and tying in a new fiber optic signal network, all without shutting down a critical corridor.

What B&B Delivered

Reconstructed the multi-road intersection with roadside hardware, drainage, and ADA improvements (curb ramps and sidewalks)
Replaced the deck of Chena River Bridge #0231 alongside pavement preservation and drainage work
Installed a fiber optic signal interconnect system linking signals along the Steese Expressway from Airport Way to College Road

The Result

A modernized, ADA-compliant interchange

A rebuilt bridge deck over the Chena River

A connected signal network across one of Fairbanks’ highest-traffic corridors

Related Projects

St Paul Airport Visual Aid Replacement

St. Paul Island, AK · 2025

Wind cone, conduit, and airport beacon replacement on a remote FAA-regulated island airfield.

AirportFAA

Systemic Signal Upgrades, Stage 1

Fairbanks & Parks Hwy, AK · 2025

Reconstructed seven signalized intersections with roadside hardware across a high-visibility corridor.

HighwayDOT

Horizontal Directional Drilling Services

Multiple sites, AK · 2017–Current

Underground utility installation beneath active roads and bridge crossings without open-cut excavation.

UtilitiesUnderground