St Paul Airport Visual Aid Replacement | B&B Electric

St Paul Airport Visual Aid Replacement

St. Paul Island, AK · 2025

AirportFAA
Client
FAA / Airport Authority
Scope
Visual aid & airfield lighting replacement
Timeline
2025
Environment
Remote island airport, FAA-regulated

The Challenge

A remote island airport needed critical visual aid systems replaced without disrupting active flight operations — logistics alone make this a difficult site to reach and stage equipment on.

What B&B Delivered

Removed and replaced the secondary wind cone with new conduit and wire
Removed and replaced the primary wind cone with new conduit and wire
Installed a ladder and platform on the Snow Removal Equipment Building
Removed and replaced the rotating airport beacon
Removed and replaced the segmented circle

The Result

Full visual aid system replacement completed on schedule

No disruption to airport operations

Delivered in a remote, FAA-regulated environment

Related Projects

Systemic Signal Upgrades, Stage 1

Fairbanks & Parks Hwy, AK · 2025

Reconstructed seven signalized intersections with roadside hardware across a high-visibility corridor.

HighwayDOT

Horizontal Directional Drilling Services

Multiple sites, AK · 2017–Current

Underground utility installation beneath active roads and bridge crossings without open-cut excavation.

UtilitiesUnderground

Cowles Street Reconstruction

Fairbanks, AK · 2025

Reconstructed Cowles Street from Airport Way through East Cowles Street, including intersection improvements, roadside light poles, and utilities.

HighwayMunicipal

Have a Similar Project?

Request ConsultationRequest Qualifications