Fairbanks & Parks Hwy, AK · 2025

HighwayDOT
Client
Alaska DOT&PF / City of Fairbanks
Scope
Signalized intersection reconstruction, seven locations
Timeline
2025
Environment
Active public roadways, high traffic visibility

The Challenge

Seven signalized intersections across Fairbanks and the Parks Highway Nenana Canyon area needed reconstruction while keeping traffic moving safely through active work zones.

What B&B Delivered

Reconstructed seven signalized intersections at multiple locations
Installed intersection improvements and roadside hardware
Upgraded signal heads, mast arms, and supporting electrical infrastructure

The Result

Seven intersections upgraded across a high-visibility public corridor

Delivered with the sequencing and safety discipline required for live-traffic work

Related Projects

St Paul Airport Visual Aid Replacement

St. Paul Island, AK · 2025

Wind cone, conduit, and airport beacon replacement on a remote FAA-regulated island airfield.

AirportFAA

Horizontal Directional Drilling Services

Multiple sites, AK · 2017–Current

Underground utility installation beneath active roads and bridge crossings without open-cut excavation.

UtilitiesUnderground

Cowles Street Reconstruction

Fairbanks, AK · 2025

Reconstructed Cowles Street from Airport Way through East Cowles Street, including intersection improvements, roadside light poles, and utilities.

HighwayMunicipal

Have a Similar Project?