Cowles Street Reconstruction | B&B Electric

Cowles Street Reconstruction

Fairbanks, AK · 2025

HighwayMunicipal
Client
Alaska DOT&PF
Scope
Street reconstruction with intersection improvements, lighting, and utilities
Timeline
2025
Environment
Active urban corridor, Fairbanks

The Challenge

Reconstructing Cowles Street from Airport Way through East Cowles Street required coordinating intersection work, lighting, and utility upgrades along an active corridor without disrupting daily traffic.

What B&B Delivered

Reconstructed the corridor with intersection improvements
Installed roadside light poles
Upgraded underlying utilities

The Result

A rebuilt, better-lit corridor with modernized utilities

Delivered along an active public street with minimal disruption

Related Projects

St Paul Airport Visual Aid Replacement

St. Paul Island, AK · 2025

Wind cone, conduit, and airport beacon replacement on a remote FAA-regulated island airfield.

AirportFAA

Systemic Signal Upgrades, Stage 1

Fairbanks & Parks Hwy, AK · 2025

Reconstructed seven signalized intersections with roadside hardware across a high-visibility corridor.

HighwayDOT

Horizontal Directional Drilling Services

Multiple sites, AK · 2017–Current

Underground utility installation beneath active roads and bridge crossings without open-cut excavation.

UtilitiesUnderground